Engineering Design:
Northeast Helical conducted several soil borings around the settling foundation and found the house was built upon a layer of organic soil, causing the settlement. Northeast Helical designed an underpinning system consisting of helical piers and underpinning brackets. The helical piles would screw through the organic soil and anchor into the good soils below.
Project Details:
The newer concrete foundation had to be partially removed to allow the installation of the helical underpinning piles. A skidsteer with a concrete hammer was utilized to demo the concrete. The helical piles extended down to about 20 feet below the foundation. The project was successfully completed in 6 working days. |