|
Foundation Underpinning - Chicopee, MA
Problem:
A
new loading dock was planned for the existing
Valor One building in Chicopee, Massachusetts.
The site grades were to be lowered, exposing the
existing foundation to frost heave. The concrete
foundation needed to be extended below the seasonal
frost line, but conventional underpinning methods
would not work.
Solutions:
A licensed professional engineer from Northeast
Helical designed an underpinning system consisting
of several helical underpinning piles to hold
the footing up for the excavation of underpinning
pits. The shoring installation took a single day
and the redesign produced significant savings
for the owner as well.
Back
to Projects
Contact us today to see how we can help you.
|